Editing Diary
September:
- Captured footage we'd filmed and imported the footage to edit.
- cut the footage up ready to be put on the time line.
November:
- Imported more footage we'd filmed and cut it up.
- Placed footage on the time line in order it is to be shown in.
- Started to get archive footage needed and what type of music would fit with the theme of our documentary.
- Starting timing opening sequence for documentary, falling short and needed one more person for the opening.
- Opening sequence nearly finished as we added footage of a giant centipede.
- Edited music to switch from a nice slow song to a heavy metal piece.
- Imported and cut more footage and placed it on the time line E.G interview with Sue.
- Finished opening sequence and added the last person to the intro, finished off timing the intro to the beat of the music.
- Imported another interview and cut it up, placed it on the time line.
- Put a piece of music on, edited it to make it shorter and made it fade in and out.
December:
- Put the titles of the people we interviewed on the documentary to introduce who the speakers where.
- Placed archive footage of roller coaster as cutaway
January:
- Placed and edited last interview with the dog attack victim and reconstruction on.
- Edited reconstruction to make it blurry, red and slowed it down.
- Finished added music and edited it to fit.
- Placed voice over on time line and bade it louder.
- Placed cutaways on the interviews and made them dissolve in and out.
- Added title of our documentary.
- Redid dog attack victim interview and placed that in.
- Lowered music volume to enable the voice over to be heard.
- Added pulsing effect to title.
- Sorted the last of the vox pops out.
No comments:
Post a Comment